403.686.3644

Sweet/Sour Battery Upgrades

Trialta engineered, designed, procured and installed new equipment and piping for various oil batteries in SE Saskatchewan. Trialta’s responsibilities were for the Mechanical, Civil, Structural and Electrical scopes of these projects.

These scopes included replacing existing gas separator packages, adding FWKO packages, installing high-pressure flare systems, adding water injection pumps, installing water filter buildings, tank farm additions, compressor replacements and compressor additions.

Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery

Would you like to learn more? Send us a message.